Shift summary — General (08:00–16:00 IST) · 18 Feb 2026
Auto-generated at shift end
Spools
3
Metres produced
5247 m
Mean quality
97.8%
FPY
92.1%
Defects raised
14
Critical defects
2
Mean TTA
1m 12s
Line uptime
96.4%
Defect family — last 24 h
Stacked by severity
- Advisory
- Critical
- Warning
Reports
Generate · export · share
Recently completed spools
8 in the last 24 h
| Spool | Product | Length | Defects | Quality | Result |
|---|---|---|---|---|---|
| KRO-SP-2026-02-091 | PV1-F 6 mm² Red | 2000 m | 4 | 98.4% | Pass |
| KRO-SP-2026-02-090 | PV1-F 6 mm² Red | 2000 m | 2 | 99.1% | Pass |
| KRO-SP-2026-02-089 | PV1-F 4 mm² Red | 2000 m | 7 | 96.5% | Pass |
| KRO-SP-2026-02-088 | PV1-F 10 mm² Red-Twin | 1500 m | 3 | 98.9% | Pass |
| KRO-SP-2026-02-087 | PV1-F 6 mm² Black | 2000 m | 5 | 97.8% | Pass |
| KRO-SP-2026-02-086 | PV1-F 6 mm² Red | 2000 m | 1 | 99.5% | Pass |
| KRO-SP-2026-02-085 | PV1-F 12 mm² Red | 1200 m | 8 | 95.8% | Review |