IST · 12 Aug 2026
Cable Inspection — Overview
Solar PV line · live KPIs, cameras, defects
Solar PV Line 1 · Running
Halol Fab Line A · 4 cameras · NVIDIA RTX 4070 12 GB
Active spool
KRO-SP-2026-02-092
PV1-F 6 mm² Red
Line speed
296m/min
Design 1000 m/min · Phase-1 target 300
Metres produced (spool)
1257/ 2000 m
62.9% of target
Current OD
6.02mm
Target 6.00 ±0.18 mm · Sikora gauge
Open defects
2
1 critical unacknowledged
OD trend — last 60 min
Deterministic gauge · tolerance band shown
Defects per minute
Rolling 60-min histogram
Camera health
4 × GigE, encoder-synchronised, 360° coverage
CAM-01
OnlineHikrobot MV-CE050
0° · 5 MP60 fps
CAM-02
OnlineHikrobot MV-CE050
90° · 5 MP60 fps
CAM-03
OnlineBasler ace acA2500
180° · 5 MP60 fps
CAM-04
DegradedBasler ace acA2500
270° · 5 MP60 fps
Shift KPIs
General (08:00–16:00 IST) · 18 Feb 2026
| Spools completed | 3 |
| Metres produced | 5247 m |
| Defects raised | 14 (2 critical) |
| Mean TTA | 1m 12s |
| Mean quality | 97.8% |
| Line uptime | 96.4% |
| First-pass yield | 92.1% |
Recent defects
Live feed · latest 6 events
| Timestamp | Spool | Meter | Code | Camera | OD | Severity | Status |
|---|---|---|---|---|---|---|---|
| 2026-02-18 14:22:04 | KRO-SP-2026-02-092 | 1247.4 m | SPK-FLT | PLC | 6.03 mm | Critical | Open |
| 2026-02-18 14:19:41 | KRO-SP-2026-02-092 | 1198.2 m | SRF-LMP | CAM-02 | 6.02 mm | Warning | Open |
| 2026-02-18 14:11:33 | KRO-SP-2026-02-092 | 1042.8 m | PRN-MIS | CAM-03 | 6.01 mm | Warning | Acknowledged |
| 2026-02-18 14:04:12 | KRO-SP-2026-02-092 | 882.0 m | OD-OVR | GAUGE | 6.20 mm | Warning | Resolved |
| 2026-02-18 13:58:07 | KRO-SP-2026-02-092 | 770.3 m | SRF-SCR | CAM-01 | 6.00 mm | Advisory | Resolved |
| 2026-02-18 13:41:22 | KRO-SP-2026-02-092 | 502.1 m | COL-DEV | CAM-04 | 5.99 mm | Advisory | Resolved |